PROJECT CONTROLS FOR OIL & GAS FACILITIES AND PIPELINES
Field-verified progress, from first weld to final turnover.
Titan connects the work in the field with the people accountable for it. One trusted record of progress, quality and documentation for owners and contractors, from construction through operations.
Every job has the same cracks. Items get missed, records go missing, and someone ends up fixing it all at the end. Titan was built by professionals who have been that someone. It gives your team the tools to catch those gaps while the work is still in front of them.
THE TITAN PROCESS
From scope to closeout, measured against one baseline.
Titan connects engineering, the field and project management in one continuous record. The scope sets the standard, the field proves the work, and the record builds as the work is done.
Baseline
Engineering and project planning define the scope. That scope becomes the baseline every quantity, status and document is measured against, from the first day to the last.
Execute
The work is tracked and verified in the field by the people doing it. Inspectors and crews use tools that think the way they do, so reporting keeps pace with the work instead of falling behind it.
Verify
Checks and balances are built into every stage. Each stage has its own verification and its own record, and anything that does not meet the standard stays visible until it is resolved.
See the trend, see the solution
Project management sees progress against the baseline as it happens, by area, system and discipline. Problems surface while there is still time to act, and the weekly update is ready before the meeting starts.
Close out
When the record is kept as the work happens, closeout can be as simple as a final export when operations takes over. The documentation is already filed, catalogued and ready for audit.
SEE IT WORKING
In use on live projects.
The field works on the drawing they already know. Project management sees the trend as it forms. These screens come from projects in progress, with project names, tag numbers, drawings and dates removed.
Tag Master. Every item lives on the drawing. Field status, open deficiencies, serial numbers and documents are one tap away, and the drawing shows what needs attention at a glance.
Facility progress. Every discipline against the same timeline, with the current pace projected forward.
Pipeline progress. Each phase from clearing to final grading, with weather and shutdown events on the timeline.
LIVE PROJECT HEALTH
Constant awareness of project health.
Metrics update the moment work is recorded in the field. Decisions are made on today's facts, not last week's report.
Spot the trend early
Progress by area, system and discipline shows where the job is gaining or slipping, well before it shows up in the schedule.
Know exactly where the work is
Every item has a location and a current status, so the question “where are we?” has a verifiable answer from the field, not an estimate.
Accountable field reporting
The field team gets simple-to-use, interactive tools to report work as it is done. Every entry is attributed and time-stamped.
Issues surfaced, not buried
Deficiencies and open items stay visible until they are resolved and closed out.
One version of the truth
The field reports production as it is verified, the way they already know how. The owner sees the same metrics as they happen, so everyone is working from the same facts.
Report-ready at any moment
Current status exports in the project's own format whenever it is needed, for the weekly meeting or the client report.
DOCUMENT CONTROL
The record builds as the work does.
Documents are captured as the work happens and filed on the item they belong to, under one project standard. No hunting through shared drives, email threads or binders at the end of the job, and no last-minute scramble to assemble the turnover package.
Every record in its place
Data sheets, certificates, material test reports, calibration and test records, manuals and photos, each kept on the item, system and area it belongs to.
One naming and filing standard
Every document is named and organized the same way across the project, whoever uploads it and whichever contractor supplied it.
Captured in the field
Paperwork and photos taken on site become clean, legible project records on the spot, instead of piling up for later.
Nothing lost or overwritten
Every addition and removal is recorded with who and when, so the history of the project record stays intact.
Gaps visible before they matter
Missing certificates and records show up while there is still time to collect them, not during the turnover review.
Turnover packages on demand
The records for a single item, a system or the whole facility are ready to download in an organized package whenever the owner's field team needs them.
THE TITAN FAMILY
One platform for the full project lifecycle.
Each product applies the Titan process to a different part of the work, with one sign-in and one shared record across them.
SECURE BY DESIGN
Your project data stays yours.
Each company's and each project's data is kept separate.
Role-based access for every person, from view only to administrator.
A full history of changes, with who and when.
No advertising or tracking. Your data is never sold.
ABOUT TITAN
Built and designed by experienced on-site oil and gas project professionals.
Our team has spent careers on facilities and pipelines: building, inspecting, testing and turning over the work. Titan is the software we wished we had on those jobs.
Titan Project Controls is a product line of Titan Projects, LLC, a Texas company.
[email protected]See Titan on your project.
A walkthrough on your own drawings, or early access to a product in development.